PROJECT 2
Schematic System Design – Concept 1a – 65 ton Multistack
66.2
Estimated Site EUI
Concept 1a
Input / Output Data
​
Model Input-Output Report
Total Energy Outputs Report – Detail 1 yr
Temp/Humidity Outputs Report – Detail 1 yr
Concept 1a
MEP System Design Data
Concept 1 MEP Design Schematic
Concept 1 MEP Design Description
Concept 1 HVAC Motor Schedule
Concept 1 Electrical System Description
Concept 1a
Simulation Data
Simulation Data Report (03/01/2015)
Simulation Data Report (04/03/2015)
Schematic System Design – Concept 1b – 40 ton Multistack
66
Estimated Site EUI
Concept 1b
Input / Output Data
​
Model Input-Output Report
Total Energy Outputs Report – Detail 1 yr
Temp/Humidity Outputs Report – Detail 1 yr
Concept 1b
MEP System Design Data
Concept 1 MEP Design Schematic
Concept 1 MEP Design Description
Concept 1 HVAC Motor Schedule
Concept 1 Electrical System Description
Concept 1b
Simulation Data
Simulation Data Report (04/03/2015)
Schematic System Design – Concept 2 – 50 Ton DOAS
58.6
Estimated Site EUI
Concept 2
Input / Output Data
​
Model Input-Output Report
Total Energy Outputs Report – Detail 1 yr
Temp/Humidity Outputs Report – Detail 1 yr
Concept 2
MEP System Design Data
Base schematic concept 2 combined
H-0 Single line diagram
H-1 Block diagram
H-2 Block diagram
H-7Roof
Ground Floor Plan-HVAC – Pfaffmann
1st and 2nd Floor Plan-HVAC – Pfaffmann
Concept 2
Simulation Data
Simulation Data Report (04/03/2015)